![Manning YB8 Operating And Instruction Manual Download Page 85](http://html1.mh-extra.com/html/manning/yb8/yb8_operating-and-instruction-manual_701729085.webp)
B1
A1
B4
A2
B2
A3
B3
A4
B1
A1
D2
C1
D1
A2
B2
C2
Example A: 2 Bottle Groups
8 Bottles, 2 Groups of 4
> Bottles A1 thru A4
noon Friday thru
noon Saturday
> Bottles B1 thru B4
noon Saturday thru
noon Sunday
Spout Starting Point
Spout Advance
12:00 PM Friday
(first action is spout advance
Example B: 4 Bottle Groups
8 Bottles, 4 Groups of 2
> Bottles A1 thru A2
filled on Friday
> Bottles B1 and B2
filled on Saturday
> Bottles C1 and C2
filled on Sunday
> Bottles D1 and D2
filled on Monday
Spout
Starting
Point
MODEL YB8
PROGRAMMING SECTION
April 1999/Manning Environmental Inc.
3DJH%
Figure 2-4 Bottle Group and Spout Advance
Summary of Contents for YB8
Page 2: ......
Page 4: ......
Page 22: ...INSTALLATION AND OPERATION MODEL YB8 April 1999 Manning Environmental Inc Page A 12...
Page 30: ......
Page 61: ...MODEL YB8 PROGRAMMING SECTION April 1999 Manning Environmental Inc THIS PAGE BLANK...
Page 90: ......
Page 106: ......
Page 108: ......
Page 119: ...9 YB8 Sampler Theory of Operation Figure 8 YB8 Sampler Block Diagram...