![Manning YB8 Operating And Instruction Manual Download Page 19](http://html1.mh-extra.com/html/manning/yb8/yb8_operating-and-instruction-manual_701729019.webp)
Plus Nuts
Discharge Hole
Leveling Feet (2 front, 2 back)
MODEL YB8
INSTALLATION AND OPERATION
April 1999/Manning Environmental Inc.
Page A-9
Figure 10
- Refrigerator
Figure 11
-
Refrigerator Plug
Figure 12
- Refrigeration Hole Placement
1.
Once you have unpacked the unit, locate the four feet
for the refrigerator (they are in a small plastic bag inside
the refrigerator, with the refrigerator owners manual).
2.
With the refrigerator empty, carefully tip it and screw a
foot into the threaded hole in the bottom of each
corner.
3.
Adjust the feet so the refrigerator is level and does not
rock.
4.
Plug the refrigerator in and begin the cooling the unit down. Manning recommends using a
water proof thermometer and a liter of water to monitor the temperature of the water within
the refrigerator. This will give a more accurate representation of the actual temperature of the
samples once sampling begins. You should allow at least 24 hours for the refrigerator to
reach a stable condition.
NOTE: Be careful not to scratch any painted surfaces. The surfaces are painted with corrosion
resistant paint. Scratches in the paint minimize this protection.
Electronics Enclosure
1.
On top of the refrigerator there will be 4 screws inserted into 4 plus nut holes. Remove the
screws from the holes and set them aside in a safe place.
2.
Place the electronics enclosure on top of the refrigerator so the holes in the PVC mounting
bars match up with the threaded inserts in the refrigerator. The front (latches are in the front)
should be facing the door of the refrigerator and the peristaltic pump should be on the right.
3.
Insert the screws and tighten snugly.
4.
Thread the discharge tube into the center hole in the refrigerator. There
will be a black rubber plug that fits into the discharge hole. This plug is
split to accept either the bottle full sensor cable or the stepper motor
cable depending on the configuration that you ordered. The cable fits
inside the plug.
Summary of Contents for YB8
Page 2: ......
Page 4: ......
Page 22: ...INSTALLATION AND OPERATION MODEL YB8 April 1999 Manning Environmental Inc Page A 12...
Page 30: ......
Page 61: ...MODEL YB8 PROGRAMMING SECTION April 1999 Manning Environmental Inc THIS PAGE BLANK...
Page 90: ......
Page 106: ......
Page 108: ......
Page 119: ...9 YB8 Sampler Theory of Operation Figure 8 YB8 Sampler Block Diagram...