214713
52
Revision A
1014366
A
B
C
D
E
Figure 3.105: Harness Routing
–
R113 Shown
(R116 Similar)
8.
Route harness (A) to light (B) on header as shown.
9.
Retrieve p-clips, plastic clamps, and cable ties from
shipping bag.
10. Remove bolts (C) on header at locations shown.
11. Secure harness (A) with p-clips, existing bolts (C), and
plastic clamp (D) into existing holes.
NOTE:
4.0 m (13 ft.) header:
Harness for disc mower is
secured with one plastic clamp (D).
NOTE:
4.9 m (16 ft.) header:
Harness for disc mower is
secured with two plastic clamps (D).
12. Secure harness (A) to light bracket with two
cable ties (E).
13. Push excess harness into carrier frame.
14. Connect plug P401 and P404 into the light (B).
Connecting Right Side Transport Harness
1011292
A
B
C
Figure 3.106: Transport Light
1.
Route transport harness (A) from opening into light
bracket (B) and plug into light connectors.
2.
Secure harness (A) to light bracket with two cable
ties (C).
3.
Push excess harness into carrier frame.
ASSEMBLING THE DISC MOWER (WITH OR WITHOUT THE DEALER-INSTALLED TRANSPORT)
Summary of Contents for R116
Page 2: ...R113 R116 Pull Type Disc Mower 1010571 Published June 2018...
Page 14: ......
Page 126: ......
Page 178: ......
Page 194: ......
Page 195: ...214713 187 Revision A Chapter 10 Hydraulic Schematics...
Page 196: ......
Page 233: ......