214713
59
Revision A
1018340
A
B
C
D
Figure 4.6: Center-Link Anchor (Right of
Center-Link)
6.
Remove cotter pin (B), washer (C), and shipping tag (D)
from pin (A).
7.
Pin (A) should slide out freely. Do
NOT
use a hammer
to remove pin (A).
8.
Adjust the center-link and/or forklift until pin (A) is loose.
1018340
A
B
C
Figure 4.7: Center-Link Anchor (Right of
Center-Link)
9.
Adjust the carrier frame so the pin can be installed in
working location. Install pin (A) and secure with
washer (B) and cotter pin (C).
1013184
A
B
Figure 4.8: Top Shield (Left of Center-Link)
10. Install top shield (B) and secure with four M10 hex head
bolts (A) and flat washers. Torque to 27
–
30 Nm
(20
–
22 lbf·ft).
Summary of Contents for R116
Page 2: ...R113 R116 Pull Type Disc Mower 1010571 Published June 2018...
Page 14: ......
Page 126: ......
Page 178: ......
Page 194: ......
Page 195: ...214713 187 Revision A Chapter 10 Hydraulic Schematics...
Page 196: ......
Page 233: ......