Lucent Technologies Lineage
®
2000 ECS Battery Plant J85500D-3
3 - 6 Engineering, Planning and Ordering
Issue 5 January 1999
*NC = No Change, C = Changed, A = Added
Reserve capacity
The customer's service and maintenance strategy are important
in determining reserve time. The availability of back-up ac
power and accessibility of the site are usually the determining
factors in battery sizing. The risk and acceptability of loss of
Table 3-A: Initial Load Drain Information
Load Circuit
List 1 (Amps)
List 2 (Amps)
1
Battery Plant
Total
Table 3-B: Anticipated Future Load Drain Information
Load Circuit
List 1 (Amps)
List 2 (Amps)
NC, C or A*
1
Battery Plant
Total