Charge capacity and recharge time
Battery string voltage drop and balancing
Battery size versus voltage drop
Lineage® 2000 engineering specifics
Initial and supplementary bays
Record wire and breaker/fuse sizes
Low-voltage battery disconnect/reconnect feature
Low-voltage load disconnect/reconnect feature
Thermal (slope/step) compensation feature
Supplementary components (field installed)
Installation tools and test equipment
Suggested installation sequence
Step A: Unpacking, handling & frame installation
Step B: Battery stand assembly
Step C: Cable support and ground system