Lucent Technologies Lineage
®
2000 ECS Battery Plant J85500D-3
Issue 5 January 1999
Installation 4 - 13
powering up instructions as provided in the associated load
equipment documentation.
Connect all loads, one at a time, by turning on the load circuit
breakers. If a circuit breaker trips immediately when turned on,
this may be due to inrush current and does not necessarily
indicate a fault condition. Attempt to close the circuit breaker a
second time. If the breaker trips again, check the wiring to the
load circuit and the instructions for powering up that load.
Installation
procedures for
plant growth
As your power needs evolve, equipment may be readily added to
the battery plant to provide any of the following.
•
expanded controller features
•
additional rectifier capacity
•
increased battery capacity
•
additional load circuits
Procedures for adding controller features, rectifiers and
batteries to an operating plant are described in the installation
sections of the associated subsystem manuals. The procedure to
add load circuits is described below.
WARNING:
Procedures in this section may cause power alarms to be
issued temporarily. Notify the alarm reporting center before
starting any installation procedure on an operating battery
plant.
Adding a load
circuit
The following procedure provides the steps to add a new load
circuit to an operating battery plant.
Step A: See Section 2 under Ordering Information for details on
obtaining additional circuit breakers.
Step B: Alarms may be issued during the installation process
(e.g. by a new circuit breaker in the OFF position). Notify the
alarm reporting center of that alarms may be received.
Step C: Open the dc distribution cover panel, taking care not to
disturb any load-carrying circuit breakers.
DANGER:
Battery voltage is present behind the distribution cover