Lucent Technologies Lineage
®
2000 ECS Battery Plant J85500D-3
4 - 10 Installation
Issue 5 January 1999
Figure 4-3: Floor mounting template, 12IR125 battery
installation (all dimensions are given in inches)
FLOOR ANCHOR LOCATION TABLE
LIST
10
A1, B1, C1
A1, B1
A1, B1
* If interference with floor reinforcing bars
occurs during Installation of anchoring device
at primary mounting location then alternate
location shall be used.
* Overall Dimension including Retainers
32.25 *
24.55 REF
3.85
2.00
3.85
2.00
A2
A2
A1
A1
5.96
1.78
19.68
*
13.72
9.66
REF
2.28
2.28
B2
B2
B1
B1
DD
DD
FRONT
A2, B2
A2, B2
A2, B2, C2
AA
1
BB
CC
1
2
11
15
PRIMARY
ALTERNATE * FIGURE