3 - 34 Engineering, Planning and Ordering
Issue 5 January 1999
(10) Other tables: Other non-standard tables may appear on the
J-drawing to provide additional engineering, manufacturing and/
or installation information. Each table should be referenced from
an engineering or manufacturing note on the drawing.
(11) Change Notes: Change or Revision Notes chronicle, in
abbreviated form, the history of drawing reissues and associated
changes, such as additional Lists, modifications to assembly
views, clerical error corrections and part number changes. Issue
number and date always follow the list of changes.
T-drawings
T-drawings are used to show wiring details, such as wire colors,
gauges, and routing, which cannot be conveniently shown in
assembly views of the J-drawing. T-drawings are similar in
format to J-drawings, with cover sheets and assembly sheets.
There is no stocklist or Table A, however, on a T-drawing. The
following T-drawing cover sheet features are essentially the
same as those for J-drawings:
•
Title Block
•
Issue number
•
Sheet Index
•
Manufacturing Notes & Symbols
•
Engineering Notes
•
Change Notes
As with the J-drawing, read all the notes on the T-drawing
completely when engineering a job. Other important features of
the T-drawing cover sheet are Tables B, C and D. Table B of the
T-drawing gives a historical record of the addition and
elimination of options. This table corresponds to the Record of
Change Table on the SD-drawing. (See below.)
As noted earlier, there is usually a close correspondence between
options defined on the SD and those shown on the T-drawing.
The exact correlation of options and figure numbers between the
two drawings is given in Table C.
Table D gives an index to the locations of T-drawing options on
the various sheets of the drawing. There is a similar Option
Index on the SD. (See below.)
The wiring information is shown graphically two ways: Shop
Figures and Installer Figures. Shop figures are numbered 1, 2, 3,
etc. for main figures and A, B, C, etc. for details. Installer figures