![Lightmed LightLink-CXL Service Manual Download Page 24](http://html1.mh-extra.com/html/lightmed/lightlink-cxl/lightlink-cxl_service-manual_1912191024.webp)
LightLink-CXL – Service Manual
Rev. No. : 01
Page
23
of
98
-
Connect the all the LCD cabling
Note: LCD power cable needs to be push up before securing the screw and 9 pins
connector needs to be connected at COM Port
Figure 4.9 LCD cable connecting process
-
Release the pressurized button to lift up height
Note: By doing this process will allow the arm ass’y and base wheel ass’y are closer
and easily to slide in the arm ass’y
Figure 4.10 Elevation Process
Pressurized button
Summary of Contents for LightLink-CXL
Page 1: ...Service Manual LightLink CXL Corneal Cross Linking System ...
Page 90: ...LightLink CXL Service Manual Rev No 01 Page 89 of 98 ...
Page 91: ...LightLink CXL Service Manual Rev No 01 Page 90 of 98 ...
Page 93: ...LightLink CXL Service Manual Rev No 01 Page 92 of 98 ...
Page 97: ...LightLink CXL Service Manual Rev No 01 Page 96 of 98 Finish this process we will get PASS ...
Page 99: ...LightLink CXL Service Manual Rev No 01 Page 98 of 98 ...