Installation
4-3
BA9300SU EN 2.1
4.1.3
Assembly with thermally separated power stage (”punching”)
The heat sink of the controllers 9321 ... 9329 can be mounted outside the control cabinet to reduce
the heat generated in the control cabinet. For this, you need an assembly frame with seal (can be
ordered from Lenze).
•
Distribution of the power loss:
– approx. 65% via the separated heat sink (heat sink + blower)
– approx. 35% inside the controller
•
The type of protection of the separated cooler (heat sink and blower) is IP41.
•
The ratings of the controller are still applicable.
Preparation for assembly:
1. Lay the halves of the assembly frame into the slot provided on the controller.
2. Push the frame halves together until the ends lock.
3. Slip the seal over the heat sink and lay into the slot provided.
Summary of Contents for EVS9321-CS
Page 3: ...Operating Instructions EDB9300UES 00414796 Global Drive 9300 servo ...
Page 21: ...Technical data 3 8 BA9300SU EN 2 1 ...
Page 57: ...Installation 4 36 BA9300SU EN 2 1 ...
Page 73: ...During operation 6 4 BA9300SU EN 2 1 ...
Page 117: ...Troubleshooting and fault elimination 9 10 BA9300SU EN 2 1 ...
Page 119: ...Maintenance 10 2 BA9300SU EN 2 1 ...
Page 188: ...Appendix 11 69 BA9300SU EN 2 1 ...
Page 189: ...Appendix 11 70 BA9300SU EN 2 1 ...