48
NE0152T Installation Guide
Statement 26
CAUTION:
Do not place any object on top of rack-mounted devices.
To install the 1U air-duct option in a 19” rack, complete the following steps:
1.
Loosen and remove the mounting screws from both sides of the mounting rail and
set them aside to reuse for securing the foam carrier in the next step.
2.
Place the half shears on the rear side of the foam carriers and use the M3.5
mounting rail screws to secure the foam carrier assemblies snugly against the rear
of the NE0152T unit. Torque the screws to approximately 1.1 Nm ± 0.1 Nm (10
inch-pounds).
Note:
There are additional M3.5 screws in the air-duct assembly kit.
Half shear
Foam carrier snug against rear of unit
Reuse mounting screws
Mounting screws
Summary of Contents for ThinkSystem NE0152T
Page 6: ...6 Lenovo NE0152T Installation Guide ...
Page 14: ...14 NE0152T Installation Guide ...
Page 30: ...30 NE0152T Installation Guide ...
Page 72: ...72 NE0152T Installation Guide ...
Page 84: ...84 NE0152T Installation Guide ...
Page 90: ...90 NE0152T Installation Guide ...
Page 110: ...110 NE0152T Installation Guide ...