ASSEMBLY INSTRUCTIONS FOR L&L FUEGO AND ROBIN KILNS
fuego-robin-assembly.pdf
REV: 4/1/2017
Page 1
2017
L&L Kiln Mfg, Inc. 505 Sharptown Rd, Swedesboro NJ 08085 P:856.294.0077 F:856.294.0070 [email protected] hotkilns.com
TOOLS NEED FOR THE JOB
You will need the following tools for the job:
1) Phillips head screw driver (medium size head)
2) Knife
3) Adjustable Wrench
4) 3/8” Nut Driver or socket wrench
5) Level (not absolutely necessary)
UNPACKING
INSPECT FOR vISIBLE DAmAGE
The carton should arrive without visible damage. If any
carton was damaged in transit, you should either refuse
shipment or unpack the kiln in the drivers presence in order
to file a damage report with the freight company. Call the
distributor immediately if there is a problem. SAVE ALL
MATERIALS UNTIL YOU ARE SURE YOU WON’T NEED
THEM. AT THE VERY LEAST NOTE DAMAGE ON THE
BILL- OF-LADING - WITHOUT THIS YOU HAVE NO
PROTECTION!
REmOvE TOP FROm CARTON
1) Cut the banding around the kiln box.
2) With a screw driver pry off the staples holding the top of
the box to the box sleave and remove the top.
UNPACKING THE KILN
1) With a screw driver pry off the staples holding the bottom
box tray to the box sleave.
2) Next remove the cardboard inset from the carton, and
remove the carton sleeve from the skid.
ASSEmBLING THE STAND
The stand consists of four legs, the stand base, and eight
1/4-20 bolts. Using the enclosed stand hardware, assemble
the kiln stand.
1) Assemble the stand legs. Make sure all the stand legs
are tight. Use a nut driver or an adjustable wrench to do
this.
Each leg gets bolted to the stand with two
1/4-20 bolts provided. They do not need nuts:
LOCATING THE KILN
1) Place the stand on the floor in the desired location. This
should be set so that the outside stainless steel surface of
the kiln will be at least 30cm (12”) to 45cm (18”) from any
combustible wall. Floor must be nonflammable.
Information concerning clearances, ventilation and elec-
trical requirements is detailed in the “INSTRUCTIONS”
section of this manual. Read now if you are uncertain
about any of these issues.
DON’T PROCEED UNTIL
YOU ARE COMFORTABLE WITH THE LOCATION
THAT YOU SELECT.
TABLE OF CONTENTS
TOOLS NEED FOR THE JOB
...........................................1
UNPACKING
......................................................................1
Inspect for visible damage ................................................1
Remove Top from Carton ..................................................1
Unpacking the kiln .............................................................1
ASSEMBLING THE STAND
..............................................1
LOCATING THE KILN
.......................................................1
SETTING UP THE KILN
....................................................2
ASSEMBLING WITH TWO PEOPLE
................................3
ASSEMBLING WITH ONE PERSON
................................3
removing the control panel ................................................3
DISASSEMBLING THE KILN RINGS ...............................5
setting up the kiln ..............................................................6