ASSEMBLY INSTRUCTIONS FOR L&L FUEGO AND ROBIN KILNS
fuego-robin-assembly.pdf
REV: 4/1/2017
Page 8
2017
L&L Kiln Mfg, Inc. 505 Sharptown Rd, Swedesboro NJ 08085 P:856.294.0077 F:856.294.0070 [email protected] hotkilns.com
7) Push the right side of the panel flush with the kiln body
and slide the mounting screws through the keyhole slots.
Reattaching the right side of the control panel.
8) Ensure that the top of the panel is flush with the top of
the firebrick. Tighten all of the mounting screws.
Ensuring that the control panel is flush.
9) Reinsert the Hinge Bar through the control panel flanges
and the lid mounting bracket.
Reinserting the hinge bar.
10) Reinsert the Cotter Pin into the hinge bar.
Reinserting the cotter pin.
11) Your kiln is now fully assembled and ready to operate.