background image

Assembly/Operating Instructions

StageTek

Guardrail

©Wenger Corporation 2013

Printed in USA 04/13

Part #281A442-03

Wenger Corporation,

555 Park Drive, P.O. Box 448, Owatonna, Minnesota 55060-0448

Questions? Call.....USA: 800-4WENGER (493-6437) • Worldwide: 1-507-455-4100 • www.wengercorp.com

Note:

Please read and understand the instructions before starting the assembly or installation.

Note:

If you need additional information, contact Wenger Corporation using the information below.

Visit the StageTek web page at www.wengercorp.com 

for detailed instructions and videos.

Basic Instructions only! 

For Replacement Parts and more detailed product information, 

refer to the StageTek

Owner’s Manual 280A099.

A

SSEMBLY

W

ITHOUT

O

PTIONAL

I

NFILL

P

ANELS

To assemble the Guardrail without the optional Infill Panels, attach Rails to the top, middle and 

bottom positions of both Upright Weldments using 3/8-16 x 3-3/4” Carriage Bolts, Tube Saddles 

and 3/8-16 Acorn Nuts as shown.

Make sure anyone assembling

or installing the StageTek

component has read and

understands the instructions.

!

CAUTION

Always comply with Warnings

or Cautions in the instructions

or posted on the equipment.

!

CAUTION

Guardrails are recommended

for instances where the deck

height is 12” (30 cm) or more.

!

CAUTION

Tube

Saddle

Upright

Weldment

3/8-16

Acorn

Nut

3/8-16 x 3-3/4”

Carriage Bolt

Top

Rail

End Caps 

may need to

be installed 

in Rail Ends

Middle

Rail

Bottom

Rail

Tube Saddle

Orientation

Summary of Contents for StageTek Guardrail

Page 1: ...iled product information refer to the StageTek Owner s Manual 280A099 ASSEMBLY WITHOUT OPTIONAL INFILL PANELS To assemble the Guardrail without the optional Infill Panels attach Rails to the top middle and bottom positions of both Upright Weldments using 3 8 16 x 3 3 4 Carriage Bolts Tube Saddles and 3 8 16 Acorn Nuts as shown Make sure anyone assembling or installing the StageTek component has re...

Page 2: ...e previous page Do not attach the Middle Rail yet 2 With the vertical wires facing outward center an Infill Panel to fit into the channel of both attached Tube Saddles behind both the Top and Bottom Rails 3 Place a Tube Saddle between the Top and Bottom Infill Panels at both ends to align with the pre drilled middle hole in the Upright Weldments 4 Push the Tube Saddles and Infill Panels inward to ...

Page 3: ...ecure the Top and Bottom Infill Panels to the Rails using evenly distributed Spacers and Nylon Ties as shown a Orient the Nylon Tie with the head towards the bottom of the assembly b After the Nylon Tie has been tightened trim off any excess to be flush with the head Spacer Nylon Tie Tube Saddle Middle Rail 3 8 16 Acorn Nut 3 8 16 x 3 3 4 Carriage Bolt Head Towards Botttom and Trim Off Excess Head...

Page 4: ...ht against the bottom of the stage deck when in the closed position 3 Move the Lower Slides to the Closed Position a Move the Lower Slide up to the Closed Position b Rotate the Pivot Lock over the Lower Slide c Tighten the Knob If multiple Guardrail Assemblies with Optional Infill Panels are being attached the gap between them can be no more than 4 10 cm apart as shown Knob Pivot Lock Lower Slide ...

Reviews: