19
4: Installation
With the installation site properly prepared, you are ready to unpack and install the
equipment. This section covers how to:
•
Unpack and move the product
•
Install the product
•
Connect electrical service
Unpacking
The following tools are required to unpack the equipment:
•
Box knife
•
#2 Phillips screwdriver
•
Flat blade screwdriver
•
Two ½” wrenches
The following safety precautions must be followed by all personnel unpacking the
equipment.
•
Wear safety glasses
•
Wear gloves
•
No loose fitting clothes
•
Wear close-toed shoes
•
Follow safe-lifting practices (do NOT attempt to lift this product without
specialized lifting equipment certified to lift up to 500 lbs.)
Summary of Contents for Capture BT 31700-00
Page 2: ...2 CAptureTM BT Fuming Chamber 2020 Present 3170000 3170001 3170002 3170003 3170004 3170005...
Page 55: ...55 Figure 7 6...
Page 81: ...81 Wiring Diagrams 100 120V...
Page 82: ...82 208 230V...
Page 87: ...87 Chamber will not achieve humidity...
Page 88: ...88 Chamber does not exhaust CA fumes...
Page 89: ...89 Door alarm active when door s closed...
Page 90: ...90 Hot Plate will not achieve temperature set point...
Page 91: ...91 White CA residue builds on inside of Chamber...