PLM Series Operation Manual rev 1.1.3
11. Appendix
79
11.2 Maintenance
During normal operation your PLM will provide trouble-free service. The main user maintenance is to
periodically clean the dust filters behind the front grilles. The two grilles can be removed by undoing the
knurled-head screws, and the foam filter elements then withdrawn. They are best cleaned with a hand-held
vacuum cleaner.
If the LCD display needs cleaning, use a soft cloth only. Do NOT use solvent cleaners of any kind as they
may attack the plastic.
In some extreme cases it may be necessary to clean the inside of the PLM. This procedure should only be
carried out by qualified service personnel. This may be necessary if the PLM has had prolonged operation
in an extreme environment such as one where “cracked oil” smoke machines are in use. If you are using
your PLM in such a heavy duty application, it is recommended to have it serviced every 3 years as a purely
preventative measure
11.3 Factory Default Settings
Modules:
Modules:
2 x 2 Aux
Levels:
Unity (all gain adjustments)
EQ:
All EQ flat
Polarity:
In phase
MaxRMS:
20 dB
MaxPeak:
21 dB
Input mutes
On
Autoselect
On
Input sensitivity:
+26 dBu
Dante
Disabled.
AES/EBU
Terminated
Iso-Float
Enabled
ISVPL:
153 / 193 V (model dependent)
Amp Gain:
35 dB
Router 1
AES 1 set as Priority 1
▸
Analog 1 set as Priority 4
▸
Router 2
AES 2 set as Priority 1
▸
Analog 2 set as Priority 4
▸
Frame/Power Output Stage
Attenuation:
0 dB
Polarity:
In phase.
Mute:
Unmuted
Load Model:
Not loaded