LMFC250 FINE CRUSHER MANUAL
4.4.3
Testing the Crusher
The correct installation procedure for the LMFC 250 Crusher, being bolted to a concrete floor, is as follows:
•
Ensure the correct operation of all moving parts.
•
Ensure the stop and start buttons operate correctly.
•
Check that the Crusher is not unusually noisy during operation.
While monitoring the machine during commissioning, place yourself at a safe operating distance from all moving parts to
prevent injury. Ensure no tools or other objects are left on, or around the Crusher during commissioning.
4.5
Maintenance Required during Dry Commissioning
Following is the procedure for dry commissioning the LMFC 250 Crusher. Follow these instructions to carefully operate and
to test the Crusher.
5
Operation
Minimum PPE
The following safety rules should be adhered to at all times to ensure the safety of the operator and the correct operation of
the machine.
•
Lubrication must not be carried out when the machine is running.
•
All guards must be fastened in place before the machine is started.
•
Prior to starting the machine, check the electrical cables for obvious defects.
•
Ensure that the work area is clear of any obstruction or material that may be detrimental to a safe working environment.
•
Do not climb or sit on the machine.
•
Electrical safety requirements are to be followed as per user
’
s company requirements.
•
Wear the following, appropriate personal protective equipment when using the machine:
Gloves
Safety Glasses
Ear Protection
Dust Mask
5
20
5.1
General Safety Rules