4.1.1
Vents and Drains
Not applicable
LMFC250 FINE CRUSHER MANUAL
4.1.2
Decibel rating
~<70 dBA (with no material through put)
4.1.3
PPE Required
The correct PPE is to be worn at all times as per company requirements.
The following details outline services and other items that may be required on site for the installation of the LMFC 250 Fine
Crusher.
4.2
Site Services Required
4.2.1
Power
The Crusher operates on a power supply of
380
-
415 V three
-
phase AC
connected via a three phase plug and socket. Other
voltage and frequency configurations are available on request. Contact details for LAARMANN can be found in Section 1 of
this document.
4.2.2
Pneumatics
Not applicable
4.2.3
Hydraulics
Not applicable
4.2.4
Water
Not applicable
4.2.5
Footings or Bench/Table/Frame/Platform detail
It is recommended the LMFC 250 Crusher be securely fastened to a concrete floor, using the high stress fasteners provided.
4.2.6
Floor Space
4.2.7
Drainage
Refer to the General Arrangement drawing in Section 2 of this manual.
Not applicable
4.2.8
Dust Extraction
It is recommended the LMFC 250 Crusher be provided with a suitable dust extraction system. There is a 100 mm dust extrac-
tion spigot provided at the rear of the machine. Dust extraction for the complete system will be covered by the customer.
4.2.9
Environmental Conditions
The LMFC 250 Crusher is designed for use indoors or under cover out of the elements.
4.2.10
Heating, Cooling or Ventilation
Not applicable.
5
18