Lockout Tagout Procedure
1-11
KVAL 990-FX Operation/Service Manual
Lockout Tagout Air Supply
Start Maintenance
7.
Once the locks and tags are in place and all personnel are clear, attempt to operate
the machine to ensure equipment will not operate.
8.
Maintenance or repairs may started.
Post Maintenance Steps
9.
After maintenance is completed, the person performing the work must ensure all
tools, spare parts, test equipment, etc., are completely removed and that all guards
and safety devices are installed.
10.
Before removing the locks and tags, the person who attached them shall inspect the
equipment to ensure that the machine will not be put in an unsafe condition when
re-energized.
11.
The lock and tag can now be removed (only by the person(s) who placed them),
and the machine can be re-energized.
12.
The tags must be destroyed and the locks and keys returned to the lockout center.
6.
Turn all air valves to the OFF position and place a pad-
lock through the hole (see illustration below).
NOTE:
Place your tag on the padlock, as per the
tagout guidelines.
Summary of Contents for 990FX
Page 4: ...KVAL 990 FX Operation Service Manual ...
Page 30: ...Safety Sign Off Sheet KVAL 990 FX Operation Service Manual 1 20 ...
Page 85: ...Glossary of Common Terms 2 55 KVAL Operation Service Manual ...
Page 90: ...System IT Administration 3 5 KVAL Operation Service Manual ...
Page 129: ...Collet Torque Values 4 39 KVAL 990 FX Operation Service Manual ...
Page 130: ...Collet Torque Values KVAL 990 FX Operation Service Manual 4 40 ...
Page 164: ...Network System Overview KVAL Operation Service Manual 5 34 ...
Page 168: ...KVAL 990 FX Operation Service Manual ...
Page 169: ......
Page 170: ......
Page 171: ......