152
394149/D
A
Screen (Cable screen) (Green)
B
Input (Ready to Transmit (RTT))
C
Ground (Signal ground)
D
Output (Trigger Out)
E
Make the connections here.
F
Channels (From left)
Minimum cable requirements
Unless otherwise specified, this cable must be provided by the installation shipyard. If
you need to install a very long cable, increase the cross section.
•
Conductors
: 2 x 2 x 0.5 mm
2
•
Screen
: Overall braided
•
Voltage
: 60 V
•
Maximum outer diameter
: Defined by the plugs and/or the cable gland
Related topics
Cable drawings and specifications, page 136
Cable layout and interconnections, page 85
Simrad EK80 Installation Manual
Summary of Contents for Simrad EK80
Page 1: ...kongsberg com simrad Simrad EK80 INSTALLATION MANUAL ...
Page 2: ......
Page 12: ...10 394149 D Simrad EK80 ...
Page 313: ...394149 D 311 Drawing file ...
Page 314: ...312 394149 D Simrad EK80 Installation Manual ...
Page 317: ...394149 D 315 Drawing file ...
Page 318: ...316 394149 D Simrad EK80 Installation Manual ...
Page 320: ...318 394149 D 201575 Transducer connector assembly and wiring Simrad EK80 Installation Manual ...
Page 352: ... 2020 Kongsberg Maritime ISBN 978 82 8066 182 1 ...
Page 353: ......
Page 354: ...Installation Manual Simrad EK80 ...