10
484164/A
ADCP calibration
The calibration procedures are provided in the relevant end user documentation.
The calibration of the acoustic doppler current profiler (ADCP) functionality is normally
done at sea immediately after leaving dry dock. If an existing sensors have been replaced, or
a new sensor has been added to the vessel, a new calibration is required. A new calibration
may also be required if the echo sounder software is updated. Refer to the software release
note.
Based on the parameters determined from the calibration, proper corrective values are into
the echo sounder software as operational parameters.
Note
Calibration must be taken seriously. The final verification of correct installation can only
be done during calibration at sea. To achieve the best results, the calibration must be
planned and done carefully.
Related topics
Physical and environmental specifications
These physical and environmental specifications are important for handling, storage and
installation.
Note
We are continuously working to improve the quality and performance of our products. The
technical specifications may be changed without prior notice.
Weights and outline dimensions
•
Physical dimensions:
–
Length
: 420 mm
–
Width
: 160 mm
–
Height
: 112 mm (Body)
•
Weight
:
–
In air
: 13.3 kg (With cable)
–
In water
: 6.3 kg (Without cable)
Simrad CP200-5C Installation Manual
Summary of Contents for Simrad CP200-5C
Page 1: ...Photo by Gatis Marcinkevics kongsberg com simrad Simrad CP200 5C INSTALLATION MANUAL ...
Page 2: ......
Page 55: ...484164 A 53 Related topics Preparations page 22 Acoustic noise page 45 Preparations ...
Page 58: ...56 484164 A Related topics Preparations page 22 Simrad CP200 5C Installation Manual ...
Page 101: ...484164 A 99 Drawing file ...
Page 110: ... 2022 Kongsberg Maritime ...