6.1 Handling load meter
Attachments, Options
6-18
WA500-6H – VEAM430100
Calibration with loaded bucket
1. Before carrying out calibration, set the machine in the follow-
ing condition.
Carry out the warming-up operation.
Carry out warming up to set the hydraulic oil temperature to
the normal working range, then carry out normal operations
(including raising and lowering the lift arm) for at least 10
minutes (preferably more than 30 minutes).
Load the bucket with a known weight.
Be careful that the center of gravity of the load does not
change when raising or lowering the lift arm.
2. Set so that the character display shows the normal service
meter and clock display.
3. Press the (
) portion of the character display mode selector
switch.
“LOAD METER“ is displayed on the top line of the character
display.
4. Use the (
) portion of the character display mode selector
switch and the (>) or (<) portion of the character display item
selector switch to display “CALIBRATION“ on the character
display.
1 9 . 0
h
0 3 : 0 9
GK050280
L O A D
M E T E R
>
<
GK050279
C A L I B R A T I O N
>
<
Summary of Contents for WA500-6H
Page 2: ......
Page 3: ...Foreword WA500 6H VEAM430100 1 1 1 Foreword...
Page 26: ...1 7 CE Conforming equipment Foreword 1 24 WA500 6H VEAM430100...
Page 254: ...3 7 Troubleshooting Operation 3 188 WA500 6H VEAM430100...
Page 344: ...4 9 Service procedure Every 12000 hours service Maintenance 4 90 WA500 6H VEAM430100...
Page 345: ...Technical Data WA500 6H VEAM430100 5 1 5 Technical Data...
Page 347: ...Technical Data 5 1 Technical data WA500 6H VEAM430100 5 3 GK032301 A B H I G C E F D...
Page 352: ...5 4 Limit values for slopes Technical Data 5 8 WA500 6H VEAM430100...
Page 401: ...Index WA500 6H VEAM430100 7 1 7 Index...
Page 407: ...Notes WA500 6H VEAM430100 8 1 8 Notes...
Page 408: ...Notes 8 2 WA500 6H VEAM430100...
Page 409: ...Notes WA500 6H VEAM430100 8 3...
Page 410: ...Notes 8 4 WA500 6H VEAM430100...
Page 411: ...Notes WA500 6H VEAM430100 8 5...
Page 412: ...Notes 8 6 WA500 6H VEAM430100...