3.3 Operation
Operation
3-132
WA500-6H – VEAM430100
Leveling operation
NOTE
z
Always operate the machine in reverse when carrying out
leveling operations.
If it is necessary to carry out leveling operations when travel-
ing forward, do not set the bucket dumping angle to more
than 8 degrees.
z
Turn the E.C.S.S. switch OFF when carrying out leveling
operations.
1. Scoop soil into the bucket. Move the machine backward
while spreading soil from the bucket little by little.
2. Go over the spread soil with the bucket teeth touching the
ground and level the ground by back-dragging.
3. Scoop some more soil into the bucket, put the lift arm control
lever in FLOAT position, level the bucket at ground level,
and smooth the ground by moving backward.
Pushing operation
CAUTION
Never set the bucket to the DUMP position when carrying out
pushing operation.
When carrying out pushing operations, set the bottom of the
bucket parallel to the ground surface.
GK032210
Summary of Contents for WA500-6H
Page 2: ......
Page 3: ...Foreword WA500 6H VEAM430100 1 1 1 Foreword...
Page 26: ...1 7 CE Conforming equipment Foreword 1 24 WA500 6H VEAM430100...
Page 254: ...3 7 Troubleshooting Operation 3 188 WA500 6H VEAM430100...
Page 344: ...4 9 Service procedure Every 12000 hours service Maintenance 4 90 WA500 6H VEAM430100...
Page 345: ...Technical Data WA500 6H VEAM430100 5 1 5 Technical Data...
Page 347: ...Technical Data 5 1 Technical data WA500 6H VEAM430100 5 3 GK032301 A B H I G C E F D...
Page 352: ...5 4 Limit values for slopes Technical Data 5 8 WA500 6H VEAM430100...
Page 401: ...Index WA500 6H VEAM430100 7 1 7 Index...
Page 407: ...Notes WA500 6H VEAM430100 8 1 8 Notes...
Page 408: ...Notes 8 2 WA500 6H VEAM430100...
Page 409: ...Notes WA500 6H VEAM430100 8 3...
Page 410: ...Notes 8 4 WA500 6H VEAM430100...
Page 411: ...Notes WA500 6H VEAM430100 8 5...
Page 412: ...Notes 8 6 WA500 6H VEAM430100...