U3022AE10
Hardware Lock-link Kit Installation (U3021-60001)
7. Place the PNA-L on top of the test set and ensure that the front frame of the
analyzer is positioned slightly forward of the locks that are attached to the test
set. Slide the analyzer back so the locks engage the front frame.
Figure 1
0
Locking the Analyzer
8. Secure the PNA-L’s lower lock-links to the test set’s upper lock-link, using the
spring–loaded screws. If the analyzer's lock-links are not aligned with the screw
holes, loosen the screws securing the lock-links to the instrument slightly to align
and tighten.
Figure 1
1
Lock-Link Screws
The Lock-link kit (U3021-60001) includes hardware to attach the PNA-L to the test
set. Refer to
“Network Analyzer Interface Kit Options” on page 13
and
for ordering information.
• PNA-L - 5023-0132 (Kit includes lock-links and screws)
•
Test Set - 5063-9253 (Kit includes lock-links and screws).
Test Set
Front Frame
Network Analyzer
Front Frame
Slide the network Analyzer
back to engage the lock link
in the back of the network
analyzer's front frame
Lock Link
screw
Slide the network analyzer
back to engage the lock link in
the back of the network
analyzer’s front frame,
(1600-1423)
Keysight U3022AE10 User's and Service Guide
23
Summary of Contents for U3022AE10
Page 7: ...U3022AE10 ...
Page 95: ...Keysight U3022AE10 User s and Service Guide 95 ...