U3022AE10
N523
2
A/
B
RF Interface Cable Connections
N523
2
A/
B
RF Interface Cable Connections
4-Port Analyzer
illustrates the cable configuration of the 4-Port analyzer. The
cables have been supplied with kit (U3021-60015), see
Cable Connection Procedure
1.
Remove the SOURCE OUT to CPLR THRU and RCVR IN to CPLR ARM jumpers (x4)
on the PNA-L. The RCVR R1 to SOURCE OUT reference loop jumpers (x1) remain
on the front panel.
2.
Connect the RF interconnect cables, supplied with this option, from the analyzer
to the test set. Torque each cable to 8 in-lb. Refer to
Over torque will cause damage to the test set and may cause connectors to spin or
become loose.
Each end of the interconnect RF cables have a different length from the bend. When
connecting the RF Interconnect cables be sure that the longer end (from the bend) is
connected to the analyzer.
Keysight U3022AE10 User's and Service Guide
27
Summary of Contents for U3022AE10
Page 7: ...U3022AE10 ...
Page 95: ...Keysight U3022AE10 User s and Service Guide 95 ...