Testing Performance
3
90000 A-Series Service Guide
33
Connections
Procedure
1
Preset the power meter.
2
Ensure that the power sensor is disconnected from any source and zero the
meter.
3
Connect the power sensor to the power meter's Power Ref connector and
calibrate the meter.
4
Make the connections to oscilloscope channel 1 as shown in the preceding
connection diagram.
5
Set up the power meter to display measurements in units of Watts.
NOTE
•
Connect output 1 of the 11667B splitter to the scope channel N input directly using the
54855-67604 adapter, without any additional cabling or adapters.
•
Connect the power sensor directly to output 2 of the power splitter without any additional
cabling or adapters.
•
Minimize the use of other adapters.
•
Ensure the SMA and 3.5 mm connectors are tightened properly:
•
8 in-lbs (90 N-cm) for 3.5 mm
•
5 in-lbs (56 N-cm) for SMA
Summary of Contents for Infiniium 90000A Series
Page 1: ...Keysight Infiniium 90000 A Series Oscilloscopes Service Guide...
Page 6: ...6 90000 A Series Oscilloscopes Service Guide...
Page 12: ...12 90000 A Series Service Guide 1 General Information...
Page 18: ...18 90000 A Series Service Guide 2 Calibration...
Page 116: ...116 90000 A Series Service Guide 5 Replacing Assemblies...
Page 120: ...120 90000 A Series Service Guide 6 Replaceable Parts Fan and Acquisition Assembly...
Page 121: ...Replaceable Parts 6 90000 A Series Service Guide 121 Power Supply and PC Motherboard...
Page 122: ...122 90000 A Series Service Guide 6 Replaceable Parts Sleeve and Accessory Pouch...
Page 128: ...128 90000 A Series Service Guide 7 Theory of Operation Oscilloscope block diagram...
Page 135: ......