1-3
CONTROL BALL INSTALLATION
1-4
SERVO MIXING LEVER UNIT ASSEMBLY
........1 pc
........8 pc
........9 pc
2mm Nut
........3 pc
3x8mm Flat Head Screw
3mm Lock Nut
........2 pc
....1 pc
........1 pc
3x55mm Socket Head Bolt
....4 pc
2mm Nut
3x5x1.8mm Spacer
Steel Joint Ball
5x8x4mm Ball Bearing
2x10mm Flat Head Screw
2x10mm Flat
Head Screw
3x5x3.8mm Spacer
Mixing Lever (3pc)
(Prepare 3 Sets)
5x8x4mm Ball Bearing
2mm Nut
2x8mm Flat Head Screw
(Use Threadlock)
Steel Joint Ball
3x4.5x.7mm Steel Washer
........1 pc
3x55mm Socket
Head Bolt
3x8mm (x2)
Flat Head Screw
(Use Threadlock)
Mixing Base Arm (Roll)
Mixing Lever Spacer
Mixing Base Cross Member
3x4.5x.7mm (x4)
Steel Washer
Complete Assembly
3mm Lock Nut
Mixing Base Cross Member
9
Use Threadlock
Use Threadlock
........8pc
Z,Q
Z,Q
........3pc
.......1pc
3x5x1.8mm Spacer
5x8x4mm Ball Bearing
2x10mm Flat Head Screw
2x8mm Flat Head Screw
3x5x3.8mm Spacer
Steel Joint Ball
........5 pc
Mixing Lever Spacer
Summary of Contents for Ergo Z230
Page 43: ...43 TEAM JR DECAL PLACEMENT Tail Boom Body Stabilizer Fin ...
Page 71: ......