5-5
TAIL PITCH CONTROL LEVER INSTALLATION
5-6
TAIL BOOM CARRIER INSTALLATION
2x20mm Socket Head Bolt
......1 pc
2mm Flat Washer
........1 pc
Tail Lever Bushing
........1 pc
2x8 Flat Head Screw
........1 pc
Steel Joint Ball
........1 pc
Tail Lever Bushing
2x20mm Socket Head Bolt
2x8mm Flat
Head Screw
Steel Joint Ball
Tail Pitch Control Lever
Snap
Onto
Ball
2mm Flat Washer
* Do not fully tighten at this time. These
bolts will be secured in Step 5-7.
3mm Lock Nut
Tail Boom Carrier (L&R)
*3x15mm Socket Head Bolt
Z,Q
Z,Q
30
3mm Lock Nut
*3x40mm Socket Head Bolt
3mm Lock Nut
........6 pc
3x15mm Socket Head Bolt
........4 pc
3x40mm Socket Head Bolt
..2 pc
Summary of Contents for Ergo Z230
Page 43: ...43 TEAM JR DECAL PLACEMENT Tail Boom Body Stabilizer Fin ...
Page 71: ......