4-1
ROTOR HEAD HUB ASSEMBLY
4-2
MAIN BLADE HOLDER ASSEMBLY
21
Phase Adjustment Ring
(insert onto base of Main Rotor Hub)
Main Rotor Hub
3x8mm Socket Head Bolt
(5 pc)
Head Button
3x8mm Socket Head Bolt
Main Rotor Head Body
Main Blade Holder Bearing
Main Blade Holder
Control Ball 4.5mm (Pre-Installed)
Main Blade Holder Bearing
Note: Use caution when inserting the Main
Blade Holder Bearings so as not to
distort/damage the Main Blade Holders.
..... 5 pc
3x8mm Socket Head Bolt
......4 pc
Main Blade Holder Bearing
TWO SETS REQUIRED
Use Threadlock
4.5mm Control Ball
......2 pc
Z,Q
Z,Q
Summary of Contents for Ergo Z230
Page 43: ...43 TEAM JR DECAL PLACEMENT Tail Boom Body Stabilizer Fin ...
Page 71: ......