5-16
n
Jenn-Air Built-in Coffee System
DIAGNOSTICS & TROUBLESHOOTING
L1
MAIN BOARD
N
13.1
ON/OFF
SWITCH
ON/OFF
SWITCH
TRIAC
M
L1
TERMINAL
BLOCK
GRINDER
F7
F5
F4
F2
MAIN
BOARD
FUSE
GRINDER
MOTOR
BK
BK
BK
R
W
W
BK
BK
L1
MAIN BOARD
N
6.2
ON/OFF
SWITCH
ON/OFF
SWITCH
PUMP
SWITCH
P
PTC
L1
TERMINAL
BLOCK
PUMP
J1-4
F5
* PUMP POLARITY: Positive side is
connected to J1-4. If meter leads
are reversed the coil will show open.
F4
F1
MAIN
BOARD
BK
BK
BK
BR
BR
BR
W
W
WATER FLOW / SWITCHES
MAIN BOARD
FLOW
METER
J2-2
MAIN BOARD
TANK
SWITCH, M7
J2-1
WATER LEVEL
SENSOR
J7-2
J7-1
J7-3
F
+5 VDC
GND
FLOW SIGNAL
WATER LEVEL /
TANK PRESENCE
w
w
w
GND
For Service Technician Use Only
Strip Circuits
PLUMBING CIRCUIT
COFFEE GRINDER
Grinder Motor
Water Flow / Switches
Pump