JCM Part No. 960-000097R_Rev. 3
© 2010, JCM American, Corporation
4 - 1 3
Disassembly/Reassembly
Universal Bill Acceptor (UBA-1x-SS & UBA-x4-SS/SU)
Section 4
Final Timing Belt Disassembly
Perform the following steps to remove the final
UBA Timing Belts:
1. Remove the two (2) screws located on each
side of the Belt Housing.
2. Remove the Cover Roller in the direction of
the large arrow in Figure 4-40.
3. Remove the two (2)
“Drive Gear (24)”
E-
Clips, its related Parallel Pin, and its Ø 6B
Bushing (See Figure 4-41 a).
4. Remove the E-Clip retaining the Bracket
Gear assembly in place (See Figure 4-41 b
1
).
5. Lift the Bracket Gear assembly up and off
the Transport Unit (See Figure 4-41 b
2
).
6. Remove “Gear M1-Z12 (P-1)” (See Figure
4-41 c).
7. Remove the second Ø 6B Bushing E-Clip
retainer, then remove the second Ø 6B Bush-
ing (See Figure 4-41 d).
8. Release the Left Pressure Spring’s tension in
the Shaft Roller Pit as indicated in the Figure
4-41 (e) exploded view.
9. Pull the Right Pusher Guide upward, and
remove the Timing Belts.(See Figure 4-42).
The Disassembly Procedure is now complete.
Reverse all of the proceeding instructions to
reassemble any of the components described
during this disassembly procedure.
Figure 4-39
Pusher Mechanism Separation
Figure 4-40
Cover Roller Removal
Figure 4-41
Timing Belt Removal Access
Figure 4-42
Timing Belt Removal