0-29
GO
-KARTS
B
U
MPERBOAT
S
Specifications subject to change without notice - Check our website for valuable information including videos, workshop and operations manuals. www.jjamusements.com
503-304-8899
ENDURANCE CL
UTCH PLA
TES
TM
BATTERY WIRING (Electric only)
NOTICE
See the battery wiring diagram on page 4-18.
Locate battery #1.
Install a cable from the positive post of battery #1 to the
negative post of battery #2.
Install a cable from the positive post of battery #2 to the
negative post of battery #3.
Install a cable from the positive post of battery #3 to the
negative post of battery #4.
Battery 1
Battery 2
+
+
-
-
Battery 4
Battery 3
Battery 1
Battery 2
+
-
-
-
-
+
+
+
Battery 4
Battery 3
Battery 1
Battery 2
+
-
-
-
-
+
+
+
Positive Bat 1
Negative Bat 3
Positive Bat 4
Negative Bat 4
Negative Bat 3
Save time topping off the water in your batteries with the
complete battery fill kit. Easy installation that saves time when
performing routine battery maintenance.
J&J #2-70-0034
BATTERY FILL KIT