![Jacuzzi J-Sha Mi Installation Manual Download Page 9](http://html2.mh-extra.com/html/jacuzzi/j-sha-mi/j-sha-mi_installation-manual_3195939009.webp)
I
(
i
38
)
Trace on the floor the hole for the external feet (1);
move the tub and perforate the floor.
Insert the plugs in the previously made holes and put the
tub back in place.
I
(
i
39
)
Adjust the middle feet (1A) so that they rest firmly
on the floor.
I
(
i
40
) Connect, as shown, the siphon to the drain, set up
as per the instructions given on the pre-installation form.
I
(
i
41
)
Secure the tub to the floor.
Electrical connection and charging
the remote control
I
(
i
42
)
Make the electrical connection (see chap
. “
Elec-
trical diagrams
”)
between the electrical box and the mains
power supply, respecting the symbols
L
phase
N
neutral and
earth: remove the cover of the box and, after making the con-
nections, close the cover again carefully, tightening the cable
clamp firmly so as to ensure protection against water.
몇
IMPORTANT: for Countries where 220-240V voltage
is supplied by a two-phase system (L+L), the connec-
tion has to be made on terminals L and N anyway.
I
Power the tub by turning on the master switch situated above
(see chapter “Electrical safety”).
I
(
i
43
)
Position the remote control on its support, leaving it
to charge for about
3 hours
.
ATTENTION:
It is important that first time filling is car-
ried out completely without interruption, to avoid com-
promising the future life of the battery. It is also neces-
sary to fasten the remote control, for example with mask-
ing tape, so that is does not fall accidentally during
installation.
Assembling accessories and checks
I
(
i
44
)
Press the flange cover (to be found in the accesso-
ry kit box) onto the hydromassage outlets.
IMPORTANT
Keep the plastic cone-shaped spanner (
i
45
), required to
remove the jet nozzles.
I
(
i
46
)
Place the cover (to be found in the accessory kit box)
over the suction inlets.
I
(
i
47
) In models with sanitation system,
pour the J-MX 07
liquid from the bottle into the relevant tank.
We recommend you use the J-MX 07 liquid disinfectant proposed by
Jacuzzi Europe SpA and available from the authorised Service
Centres or from authorised Sales offices (1/2 litres packages). This
has been suitably tested to guarantee maximum efficiency with the
doses expected by the equipment mounted on the bath.
I
Fill the tub with water so that the highest jets of the tub are
covered.
I
Check general tub operation following the instructions given
in the “Use & Maintenance” manual.
NOTE: if the remote control recharging time has not yet
reached 3 hours, only the hydromassage can be started (us-
ing the push button indicated in
i
56).
몇
The Cromodream
®
radio and lights can be started and checked
when the battery is completely charged and then you will be
able to remove the remote control from its support.
I
Also check that all the clips (rubber couplings and air supply
hoses) and all the hydraulic connections are watertight.
It is especially advisable to check proper operation of the over-
flow and that there are no leaks from the previously installed
pipes or from the drain by leaving the taps open until the water
reaches the overflow.
I
EMPTY THE TUB.
Installing the panels
I
(
i
48
) Assemble the L-brackets with the plastic cylinders
according to the various indicated configurations (also refer to
the following figures).
I
(
i
49a, 49b: 180x90; 49c: CORNER
) Depending on the
model to be installed, place brackets on the legs. Then adjust the
position with respect to the edge of the tub as per the distances
shown.
I
(
i
50a: 180x90; 50b: CORNER
) (1) On the inside of each
panel (front and side) attach the brackets at the indicated points.
(2-3) Then, on each bracket, insert a plastic clip, placing at about
the halfway point of the slot (4).
I
(
i
51
) Fix the bracket to the central crosspiece of the
frame, adjusting its height to the indicated measurement.
I
(
i
52a: 180x90; 52b: CORNER
) Click the springs (B) on-
to the legs located at the corners of the tub and make them s-
lide up until they touch the top, pushing them from both sides
so that they settle inside the tub edge. Insert the ring (A) into
the groove in the leg.
I
(
i
52a: 180x90; 52b: CORNER
) Fasten the under-edge
springs (C) to the plugs (D) located under the edge of the tub.
The number of under-edge springs depends on the tub model.
I
(
i
53
)
180x90:
Press in the side panel (L) between the cor-
ner springs (detail 1), the centre springs (detail 2) and the tub
edge. Make sure you attach the plastic clips to the indicated sup-
ports (detail 3).
180x90 • CORNER:
Press in the front panel (F) between the
springs and the tub edge (detail 1); proceed as per the instruc-
tions in the previous phase, including, for mod. 180x90, the side
panel.
I
(
i
54
) Then attach the front to the bracket using the screw
as shown.
9
Summary of Contents for J-Sha Mi
Page 2: ...Italiano 3 English 7 Fran ais 11 Deutsch 29 Espa ol 33 37...
Page 16: ...16 1 3 2 7 i 5 i 1 2 3 A 6 i 1 3 2 3 i 4 i 2 1 8 i...
Page 17: ...17 11 i 1 T U 2 12 i R 13 i S R P Q P Q 1 2 14 i P Q M N K L R S T U 10 i 1 2 9 i...
Page 18: ...18 1 2 19 i 20 i 2 1 M5x5 mm 17 i 1 2 3 18 i M M P R L K L 2 1 3 15 i 45 1 3 2 16 i...
Page 19: ...19 3 2 A 1 23 i 1 1a 1b 2 A 24 i 1a 1b 1b 180 SX DX 24a i 21 i 45 1 3 2 22 i 180x90...
Page 20: ...20 1 2 2 2 3 27 i 3 M6 6 4 x 12 mm 28 i 1 2 3 4 25 i 4 3 5 2 1 B C 26 i 1a 24b i CORNER...
Page 21: ...21 33 i 1 2 3 34 i 1 2 3 31 i 32 i 29 i 30 i...
Page 22: ...22 37a i 37b i 90 1 2 3 4 35 i 1 90 2 3 4 5 36 i CORNER 180x90...
Page 24: ...24 1 3 2 47 i 43 i 44 i 45 i 46 i...
Page 28: ...28 56 i 3 9 x 19 mm 54 i 55 i 1 2 3 L F F 53 i...
Page 41: ......
Page 42: ......
Page 43: ......