PhaseStation 53100A User’s Manual V1.04 25-Apr-2022
126
Abort and retrigger selected acquisition (
Ctrl-a
)
Keep and retrigger selected acquisition (
Ctrl-k
)
Like
Acquire
→
Stop/repeat acquisition (
Space
)
, these commands are normally accessed
via their respective keyboard shortcuts. Often used when you accidentally disturb the
equipment or remember an omitted step in the measurement procedure,
Ctrl-a
will
restart the selected plot’s measurement immediately with no further interaction.
Ctrl-k
behaves similarly, but it will not discard the acquired data before relaunching the
acquisition.
These commands operate as follows:
•
If no plots are loaded, either command will bring back the most-recently-used
acquisition dialog, as if the
Space
bar shortcut were used.
•
Otherwise, if the selected plot is associated with an acquisition in progress, that
acquisition will be terminated. (Any other acquisitions in progress will not be
affected.)
•
If the
Abort (
Ctrl-a
)
command was issued, the selected plot will be closed and its
data discarded. A new acquisition will be started in its place, using the driver
associated with the now-deleted plot. The new plot will retain the same
position in the legend table.
•
If the
Keep (
Ctrl-k
)
command was issued, the selected plot will
not
be closed. A
new acquisition will be launched with its instrument driver. The resulting plot
will appear in the next available slot in the legend table.
When applied to an acquisition in progress,
both commands work immediately without
prompting for confirmation
if
File→Warn before retriggering measurement in progress
is unchecked. They're assigned to control keys to make them harder to press
accidentally.
Summary of Contents for PHASE STATION 53100A
Page 1: ...TM 53100A Phase Noise Test Set User s Manual Revision 1 04 April 25 2022...
Page 16: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 16...
Page 18: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 18...
Page 20: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 20...
Page 30: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 30...
Page 36: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 36...
Page 42: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 42...
Page 64: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 64...
Page 74: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 74...
Page 104: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 104...
Page 116: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 116...
Page 122: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 122...
Page 130: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 130...
Page 140: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 140...
Page 214: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 214...
Page 215: ...PhaseStation 53100A User s Manual V1 04 25 Apr 2022 215 Appendix Legal and regulatory notices...