Installation of the bottom metal sheet
9.2.4)
Add a batten or a support batten under the bottom metal sheet to support this one.
This batten
will at least make all the width of the PV field.
The thickness of this batten will be identical to the
thickness of the support batten (d)*.
Align the batten with the higher edge of the
bottom metal sheet
Bottom metal sheet in
transparency
(View of top)
Set up and fasten the bottom metal sheet all over the width of the PV field. Fasten only the top part of
the bottom metal sheet.
* Reference nomenclature
26
PV field positioned at the gutter/eave