This document is the property of IRFTS. It shall not be reproduced or shared with third party without agreement IRFTS
9.2.1)
Set up the first support batten at 260mm from the eave batten
(tilting lath).
For support batten wider than 250mm leave a 10mm gap with
the eave batten (tilting lath) and do a chalk line at 260mm from
the eave batten (tiliting lath) to create a reference line.
Screw the support batten following the recommendations page
17 to 19 to know the type and the number of screws to be used.
* Reference nomenclature
9.2.2)
Reference support batten (d)*
PV field positioned at the gutter/eave
Positioning of the flooring at the gutter/eave
This section of the assembly guide relates only to the installations of PV field
positioned at the gutter/eave
CAUTION:
The low part of PV field (with the gutter) must
imperatively be on the same plan as the flooring of the system.
In the contrary case the dimension of 260 mm is not applicable
any more.
It is necessary to move up the PV field in the slope
direction.
The dimension of positioning must be redefined, see
page 24.
0°
Reverse slope FORBIDDEN
Remove the tiles of the photovoltaic field, for L and H to see page 12 and 13
H
L
23
PV field positioned at the gutter/eave
Modèle “M-1” 60 Cellules 6" Paysage