Installation of the bottom metal sheet
9.2.4)
The bottom metal sheet must be aligned with the frames on each side of the PV field.
Position all the frames of the first line while proceeding as indicated page 26. Do a marking at each
end on the wood.
Then slide the frames upward slightly
(view with fictitious frames)
Marking
(view with fictitious frames)
(view with fictitious frames
Marking
Cut the top batten of the double lath 250mm wider than the marking so that the remaining batten is
on the same level as the reference support batten.
250 mm
250 mm
28
PV field positioned at the gutter/eave
Modèle “M-1” 60 Cellules 6" Paysage