Inf
o
rm
at
io
n
an
d
Non
-c
o
nt
rac
tua
l v
isu
al
s.
Sub
je
ct
t
o
t
ec
hn
ic
al
c
ha
ng
e wi
tho
ut
no
ti
ce
.
This document is the property of IRFTS. It shall not be reproduced or shared with third party without agreement IRFTS
9.2.4)
Position the frame (1) in the slope direction using two
screws of Ø 6 placed in the openings indicated and put
them leaning against the reference support batten (d),
for reference batten wider than 250mm align the hole
with the chalk line as inicated p.23
* Refrence nomenclature
Replace the first tile at the lower left
corner, Position the first frame (1) at a
distance of 40 mm MAXIMUM of the edge
of the tile
40 mm MAXI
Reference support batten (d)*
27
Installation of the bottom metal sheet
PV field positioned at the gutter/eave
DO NOT SCREW THESE SCREWS IN REFERENCE SUPPORT BATTEN.
MUST REMOVE SCREWS BEFORE THE MOUNTING OF THE PV
MODULES.
Modèle “M-1” 60 Cellules 6" Paysage