background image

 Page 5

EN

Chapter 1 General information

1 General information

1.1 Information about this manual

•  This manual helps to ensure safe and efficient use of 

the machine.

•  Operating personnel must have carefully read through 

and understood this manual before starting any work.

•  Compliance with all the specified safety instructions is 

a basic prerequisite for working safely.

•  This manual is a component of the machine and must 

be stored within direct proximity of the machine, acces-
sible to operating personnel at all times.

•  In addition to the notices in these instructions, the local 

accident prevention guidelines and national occupa-
tional health regulations also apply.

1.2 Symbol explanation 

Hazard notices feature symbols to make them easier to 
identify. These indicate the severity of the hazard.
•  You must observe this information.

!

DANGER

  DANGER 

indicates an immediate hazard. 

Death or serious injuries may result from non-compliance.

!

WARNING

  WARNING 

indicates a potentially dangerous 

situation. Death or serious injuries may result from a failure 
to avoid these situations.

!

CAUTION

  CAUTION

 indicates a potentially dangerous 

situation. Minor or slight injuries may result from failure to 
avoid these situations or damage to the machine or some-
thing in its vicinity.

High pressure variants: inoBEAM F30 “HP”

There are three pump sets for the inoBEAM F30. 

Set “D”-F30 

for spray applications 

- Set “R”-F30

 for floor levelling compounds 

- Set “HP”-F30 

for airless spray-on smoothing compounds

HIGH 

PRESSURE

In these instructions, all deviating or supple-
mentary specifications for the 

HP variant

 are 

shown in a box with the symbol next to it.

NOTE

 

NOTICE

 draws your attention to useful tips for 

effectively handling the machine.

1.3 Information about this manual

1.3.1 Purpose of this operating manual

The operating manual is used to provide information to the 
operating manager, assembly fitters and machine operators 
on the construction site. It contains important instructions 
for safe use, optimum results and a long service life.

!

DANGER

  Risk of incorrect operation

Failure to observe the operating manual could put the 
operator’s life and health at risk and damage the ma-
chine.

•  Read this operating manual carefully before passing it 

on to your assembly fitters or operators.

•  Please ensure that assembly fitters and operators read 

this operating manual carefully before they start install-
ing and commissioning the machine.

•  Always keep the operating manual to hand and in a leg-

ible condition.

1.3.2 Disclaimer

All technical information, data and instructions for use con-
tained in this operating manual reflect the state of the art at 
the time of printing and are based on our experience thus 
far and the best of our knowledge.
The manufacturer cannot be held liable for any damages as 
a result of:
•  Failure to comply with this manual
•  Improper use
•  Assignment of non-trained personnel
•  Unauthorised alterations
•  Technical changes
•  Use of non-approved spare parts

1.3.3 Warranty

Statutory warranty periods of 12 months from the date of 
purchase/the date of invoice of the industrial end customer 
apply to our machinery.

Summary of Contents for InoBEAM F30 D

Page 1: ...EN Read this entire original operating manual before starting work Original Operating Manual InoBEAM F30 delivery pump...

Page 2: ...to you or in urgent cases contact us directly We work constantly to further develop our products and reserve the right to make changes for technical reasons relating to building legislation Yours fai...

Page 3: ...city weight dimensions 11 3 3 Mortar pressure gauge 11 3 4 Material hopper 11 3 5 Motor 11 3 6 Pump shaft 11 3 7 Rotor stator 11 3 8 Noise emissions 11 3 9 Operating conditions 11 4 Assembly and funct...

Page 4: ...P 33 7 3 6 Checking operating performance 34 7 3 7 Topping up material 34 7 3 8 Changing material 34 7 3 9 Change of location on the construction site 34 7 3 10 Work break end of work 34 7 3 11 Cleani...

Page 5: ...on smoothing compounds HIGH PRESSURE In these instructions all deviating or supple mentary specifications for the HP variant are shown in a box with the symbol next to it NOTE NOTICE draws your atten...

Page 6: ...mped to the processing location by means of mortar hoses There it is either poured onto the floor or applied to walls or ceilings with the appro priate spray guns or glue guns Only use the machine wit...

Page 7: ...re working on the pump shaft interrupt the external power supply Loosen the screws of the protective screen above the material hopper only when the machine is switched off 2 To do this press the red p...

Page 8: ...ne without first consulting Inotec GmbH and obtaining its written approval Other wise the operating license will become void 2 2 1 Notices in the operating manual HIGH PRESSURE WARNING ATTENTION Risk...

Page 9: ...the mains plug 2 Always install the machine in such a way that it is level and stable 3 Secure the machine against undesirable movements 4 Reconnect the machine to the external power supply before res...

Page 10: ...device causes a recoil force of up to 15 N Be prepared for this recoil force oth erwise your hand may be pushed back or you may lose your balance This can cause significant injuries 2 6 Personal prote...

Page 11: ...80 m up to 30 m Delivery height for set D R Delivery height for set HP up to 25 m up to 15 m to be processed max 6 mm Weight approx 85 kg Dimensions Length 1 450 mm Width 530 mm Height 700 mm Dependin...

Page 12: ...r or applied to walls or ceilings with the appropri ate spray guns or glue guns HIGH PRESSURE NOTE Do not use a gun filter when applying spray on filler and similar mate rials as the filter will becom...

Page 13: ...e machine without mortar pressure gauges Before disconnecting the conveyor hoses make sure that the hoses are depressurised To do so check the pressure indicator on the mortar pressure gauge The press...

Page 14: ...connections Item Component 1 Pump ON Start Pump OFF 0 Reverse pump Back 2 Pump rotation speed This rotary knob potentiometer is used to ad just the pump s rotation speed 3 Set D R Connection for remot...

Page 15: ...be carried out by instructed persons Ensure that the machine is depressurised The pressure gauge must display 0 bar Do not reach into the rotor when it is in motion Wear tight fitting clothes and tak...

Page 16: ...ose Abrasion resistant special hose for pumping highly pressurised wet mortar largely kink proof For an operating pressure of 40 bar with 3 times the reliability Black on the outside With mortar hose...

Page 17: ...e For particle sizes up to 1 5 mm Item no 10024144 P inoCOLL PRO one handed gun For applying reinforcing mortar and finishing plaster up to 4 mm particle size Operating pressure up to 40 bar Item no 1...

Page 18: ...item no 10024098 10 mm 12 mm 14 mm 16 mm Item no 10024089 10024090 10024091 10024093 P P P P Plastic material hopper Material container hopper as an optional attachment for the pump hopper for increa...

Page 19: ...mm Hose 25 mm 35 mm Item no 10008116 007 10008116 008 P P P P 230 V INOTEC Compact 330 compressor The compact 230 volt compressor is ideal for many applications such as spraying decora tive coatings...

Page 20: ...gold 89 mm 18 l min 40 bar e g for spray applications Scope of delivery Pressure and suction flange with tension rods mortar pressure gauge rotor stator D6 3 Eco gold Item no 10041913 P Static mixers...

Page 21: ...ength 1 5 m Item no 10035854 P Graco RAC X nozzle holder for RAC X nozzles Operating pressure 280 bar Suitable for Graco PAA FFA HDA WA nozzles Connection thread 7 8 Item no 10012119 P Graco HDA HDA H...

Page 22: ...3718 P Double nipple Hose connection this connection is rigid does not rotate Type max pressure 1 4 ET x 1 4 ET 410 bar 1 4 ET x 3 8 ET 350 bar 3 8 ET x 3 8 ET 410 bar 1 2 ET x 3 4 ET 410 bar 1 2 ET x...

Page 23: ...0 Units Frame complete 2 10043189 1 00 Units Spur gear motor 3 kW with taper roller bearing 3 10044182 1 00 Units Complete switching cabinet 4 10041185 2 00 Units Black wheel puncture free 5 10006192...

Page 24: ...ountersunk screw V4A DIN7991 10042133 1 00 Units Flat seal for suction flange 10043417 1 00 Units Motor connection cable without plug 10006526 2 00 Units Reduction metal M 25 x 1 5 M 20 x 1 5 4 7 2 Pu...

Page 25: ...y for R coating 1 pcs 2 10041057 Suction flange for R coating 1 pcs 3 10038745 Mortar pressure gauge 1 pcs 3 1 10041938 Copper sealing ring 1 pcs 4 10022522 Stator R7 1 5 1 pcs 5 10022887 Rotor R7 1 5...

Page 26: ...ange with the check valve 2 Insert the copper gasket into the outlet flange and place it on the centre piece 4 Screw the pressure sensor onto the pressure gauge re ceptacle 3 Insert the three screws M...

Page 27: ...tity UQ Name 10044182 1 Units Switching cabinet inoBEAM F30 1 10016010 1 Units Mains filter 2 10015549 1 Units Frequency inverter 3 10044150 1 Units Power supply unit 4 10044320 1 Units Circuit breake...

Page 28: ...r 2 10007709 1 Units Stainless steel drive shaft 3 10043949 1 Units SKF protective sleeve for shaft d 59 99 mm 4 10043948 1 Units Intermediate flange 5 10004162 2 Units Shaft sealing ring 60 x 80 x 8...

Page 29: ...ss Name of the transport company and the driver Date and time of the delivery Order number and machine name according to the delivery note Description of the damage Signature of the driver Signature o...

Page 30: ...ioning the device 6 1 Safety during installation DANGER Electrical voltage Danger of death due to electric shock Work on the electronic control system may only be per formed by a qualified electrician...

Page 31: ...milk or wallpaper paste into the material hopper as pre lubrication 3 Switch on the machine by pressing the main switch green button 4 Switch on the pump by turning the switch to Start and allow the...

Page 32: ...material may splash while filling the material hopper and also cause injuries especially in the region of the eyes and face Always wear safety goggles Dispose of the empty buckets and other packaging...

Page 33: ...HP HIGH PRESSURE 1 Switch on the machine by pressing the main switch green button 2 Start the pumping process by setting the switch on the switching cabinet to Start 3 Hold the spray gun over an empt...

Page 34: ...F30 is equipped with two wheels two swivel castors and an extended handle on the frame The inoBEAM can therefore bemovedontheconstructionsiteconveniently CAUTION Changing location can put the safety...

Page 35: ...ay plasters Cotton plasters Concrete bonder Bitumen Floor filling compounds Fire protection mortar Decorative fine coats Liquid woodchip Floor levelling compounds Porous concrete coats Lime based fini...

Page 36: ...ne and close the ball valve on the spray head 3 Then fill the material hopper with water and remove any adhering material e g with a brush 4 Press the green button on the remote control cable to switc...

Page 37: ...opper over a suitable receptacle container until it is empty Do not allow the pump to run dry 2 Stop the pumping process by turning the switch on the switching cabinet to 0 3 Release the residual pres...

Page 38: ...work DANGER Electrical voltage Danger of death due to electric shock Work on the electronic control system may only be per formed by a qualified electrician Switch off the machine and pull out the mai...

Page 39: ...n INOTEC service centre Once a year recommended by a service technician Electrical inspection DGUV V3 by a qualified electrician or at an INOTEC service centre Once a year Mandatory stipulated by DGUV...

Page 40: ...age due to escaping and or flying material and or bursting conveyor hoses Before disconnecting the conveyor hoses make sure that the hoses are depressurised To do so check the pressure indicator on th...

Page 41: ...ians Pump shaft me chanically blocked Switch off the machine and pull out the mains plug Check whether any hardened material or foreign bodies are in the pump shaft if necessary remove the hardened ma...

Page 42: ...out the mains plug Wrap the coupling connection on the pressure flange with tear resistant foil Loosen the GEKA coupling Loosen the blockage by tapping or shaking at the location of the blockage Wear...

Page 43: ...cracks or other external damage WARNING Risk of injury posed by improper disas sembly Stored residual energy sharp components points and corners on and in the machine can cause injuries Ensure there i...

Page 44: ...s with the relevant fundamental safety and health regulations of the EC Directive 2006 42 EC This declaration will become void in the event of any modification made to the machine without our approval...

Page 45: ...t to deduct the working hours spent at current billing rates and or a percentage of the value of the goods from the credit note and with respect to machine returns we reserve the right to carry out a...

Page 46: ...Page 46 EN Chapter 13 Systems 13 3 Circuit diagram of the machine...

Page 47: ...Page 47 EN Chapter 13 Systems 13 4 Circuit diagram of the switching cabinet...

Page 48: ...ustomer Consultant Date Number Item no Item name Our General Terms of Business Delivery and Payment apply The customer has been made aware of these terms and agrees to the application of the same All...

Page 49: ...Faults causes and solutions 40 Functionality 12 G General information 5 General risk sources 7 General Terms of Business of the company 45 I Information about this manual 5 Intended use 6 M Maintenan...

Page 50: ...sales partner English language 50 INOTEC GmbH Headquarter Daimlerstra e 9 11 79761 Waldshut Tiengen Germany Phone 49 7741 6805 675 Fax 49 7741 6805 665 E Mail j tetling inotec gmbh com Wherever you ar...

Page 51: ...ct range Delivery pumps Mixing pumps Mixers Delivery systems OWC technology Silo technology Airless devices Cutters Grinders One handed guns Accessories spare parts Waste water systems Tillage Power t...

Reviews: