
Harrier GT Range
- Installation
5
INSTALLATION
2.2 LEVELLING
Insert the cylinder into the hole provided in each foot of the heating body and screw the adjustable foot into it. Level.
8219-EN-20
3
ASSEMBLY
For the assembly of the boiler, refer to the relevant paragraph of the instruction book.
4.1 DIMENSIONAL INFORMATION REQUIRED
8219-EN-17
4
HYDRAULIC CONNECTION