![background image](http://html.mh-extra.com/html/ideal-boilers/harrier-gt/harrier-gt_installation-assembly-and-servicing_616971021.webp)
Harrier GT Range
- Installation
21
ASSEMBLY
ORDER OF ASSEMBLY
The order of the assembly is given by the numbers
shown at the bottom of each of the different views; for
boilers delivered with the body assembled, begin at view 10.
• Tools necessary:
- 1 cross head screw driver
- 1 hammer
- 1 knife
- spanners of 8, 13, 17 and 19 mm
- 1 putty application gun
- 1 JD- TE, or W simplified installation tool
- 1 jumper bar
- 1 pipe wrench
- 1-35 mm spanner or a parallel groove clamp
Remark: spare screws, etc. are provided.
1
- Establish the A or B dimensions depending on the
direction in which the burner door will be opened and the
length of the burner (see instructions § 2.1)
- Put the rear section into position and support it. If
applicable, fit the adjustable feet (see § 2.2 of this
document).
2
BP 7 à/to 12
- Clean bores and nipples with a diluent. Coat them with the
lubricant provided with the sections.
8219-EN-28
8219-EN-29