
INSTALLATION
12
Harrier GT Range
- Installation
7.2 STANDARD CONTROL PANEL
8259N2
The connections are made on the terminal strip in the control panel, accessible by opening the panel (3 screws at the back -
see diagram).
The connection cables are directed towards the front via the two cut outs in the rear panel of the boiler, and routed in the cable
run to the control panel via the 2 rectangular cutouts in the front top panel.
8.1 DELUXE (OPTION) - CONTROL PANEL
8
START UP
8.1.1 Presentation of the control panel
1. Double STB-STW switch: to test the safety thermostat,
press simultaneously on the two switches STB and STW
(put the summer/winter switch 2 ( ) in «Summer»,
position “ ”)
2. Burner/Heating pump double switch: Switch controlling
the burner and heating pump.
- In «Winter», position the heating and the domestic hot
water are on.
- In «Summer» position ,only the domestic hot water is
on (if a calorifier is connected).
Where an SVmatic weather compensator is fitted or for a
cascade installation, the two switches must be in
«Winter» position .
8219-EN-5B