
30
Harrier GT Range
- Installation
ASSEMBLY
20
21
8219-EN-48
8219-EN-49
- Hook the front top panel into the side panel rivet studs.
- Pass the different connection cables through the orifices in
the rear panel and direct them through the wiring ducts
(the 230 V cables on one side and the sensor cables on
the other) and bring them to the front via the cut out in the
front top panel. (See technical instructions chapter 7 for
the E and standard control panels or the instructions
particular to the DIEMATIC if applicable).
BP 22 - 23 - 24
- Fit the control panel and pass the burner cable (optional
on the standard control panel) through the orifice provided
in the top panel, then bring it down inside the fold of the
right hand protective sheet metal strip of the insulation to
the burner (if it is too long, push it back between the front
panel and the insulation).