
Harrier GT Range
- Installation
27
ASSEMBLY
14 MOUNTING OF LOWER BAFFLES
Lower Baffles
Harrier GT 5
Harrier GT 6
Harrier GT 7
Harrier GT 8
Harrier GT 9
- lg 412
4
2
- lg 572
2
2
2
4
Baffles Table
- Break all the stops of the baffles using a mallet for
instance, except the stop at the front (see figure).
- Fit the baffles of the 2 lower flue ways placing the 2 last
baffles until the stop is reached - detail E (see leaflet
provided with the baffles).
- Close and fasten the door (4 H 12 nuts + 4 L 12N thick
washers - 19 mm spanner).
- After assembly of the body, the installer should carry
out a water pressure test to 5.2 bar.
8219-EN 40 B
8219N5
8219N4
8219-EN 62 A