Harrier GT Range
- Installation
23
ASSEMBLY
6
- Put the assembly tool into position.
- Tighten progressively so that the upper and lower
connections are brought together.
8219-EN-33 B
7
- Fit the rest of the intermediary sections (one by one) by
repeating the procedure shown in drawings 2, 3, 4, 5 and
6.
- Each time that two or three sections have been
tightened, slide the chocks forward using the jumper bar
to raise the boiler.
8219-EN-34
8
- Put the front section into position and tighten using the
assembly tool, leave the assembly tool in position. -
- Remove the 170 mm high chocks.
- Fit the three assembly rods (with dia.12 washer and H12
nuts - 19 mm spanner). The washers are to be found in
the covering pack (tightening torque 10 Nm).
- Remove the assembly tool.
8219-EN-35 C