- 9 -
II
INSTALLATION
This Part describes the mechanical installation of the unit, including transportation, unpacking inspection,
installation layout, and installation procedures, etc.
EQUIPMENT HANDLING, UNPACKING, INSPECTION
2.1 TRANSPORTATION & HANDLING
Choose a road with better conditions to prevent excessive bumps when transporting.
The tilt angle of the unit should be kept within the range of 75 ° ~ 105 ° when transporting. (Figure 2-1)
105
75
Figure 2- 1
The tilt angle of the unit
Please use a forklift to carry it. If there is no forklift, please move it with the help of the cylinder-shaped things like
crabstick.
Rolling transport: 6 piles with same size are placed under the base of the unit. Each roller must be a little longer
than the base frame and suitable for the balance of the unit. (Figure 2-2)