8.
Put
your
index
finger
against
the
side
of
the
latch
lever
3
,
and
your
thumb
against
the
front
of
the
latch
lock
2
.
9.
Gently
push
the
latch
lock
2
away
form
the
rail
as
you
move
the
latch-lever
3
towards
the
front
of
the
rail.
The
latch-lock
carrier
assembly
slides
against
the
spring
tension.
10.
Release
the
latch
lock
and
continue
to
slide
the
latch-lock
carrier
for
approximately
13
mm
(0.5
in).
The
latch
lever
engages
in
a
hole
in
the
back
bracket
assembly,
and
holds
the
latch-lock
carrier
in
the
retracted
position
11.
Place
the
front
end
of
the
left
rail
in
the
rack
cabinet.
Align
the
top
of
the
front
bracket
1
with
the
required
EIA
marking
that
is
on
the
rack.
12.
Align
the
locating
pins
3
with
the
holes
that
are
in
the
rack-mounting
flange
2
.
2
1
3
Figure
29.
Opening
the
back
latch-lock
carrier
assembly
1
2
3
Figure
30.
Installing
the
front
end
of
the
rail
28
Installation
Guide
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...