Steps:
Using
the
following
inspection
checklist
as
a
guide,
inspect
the
uninterruptible
power
supply
for
unsafe
conditions.
If
necessary,
see
any
suitable
safety
publications.
1.
If
any
equipment
has
been
damaged
during
the
shipment,
keep
the
shipping
cartons
and
packing
materials.
2.
File
a
claim
for
shipping
damage
within
fifteen
days
of
receipt
of
the
equipment.
Uninterruptible
power
supply
requirements
This
topic
lists
the
requirements
for
the
uninterruptible
power
supply.
Ensure
that
you
comply
with
the
following
requirements
for
uninterruptible
power
supplies:
v
Each
uninterruptible
power
supply
should
be
connected
to
a
separate
branch
circuit.
v
A
UL
listed
15
A
circuit
breaker
must
be
installed
in
each
branch
circuit
that
supplies
power
to
the
uninterruptible
power
supply.
v
If
a
rack
power
distribution
unit
is
used,
each
uninterruptible
power
supply
must
be
connected
to
a
separate
power
distribution
unit.
v
The
voltage
supplied
to
the
uninterruptible
power
supply
must
be
200–240
V
single
phase.
v
The
frequency
supplied
must
be
between
50
and
60
Hz.
Note:
If
the
uninterruptible
power
supply
is
cascaded
from
another
uninterruptible
power
supply,
the
source
uninterruptible
power
supply
must
have
at
least
3
times
the
capacity
per
phase
and
the
total
harmonic
distortion
must
be
less
than
5%
with
any
single
harmonic
being
less
than
1%.
The
uninterruptible
power
supply
also
should
have
input
voltage
capture
that
has
a
slew
rate
faster
than
3
Hz
per
second
and
1
msec
glitch
rejection.
Emergency
power-off
(EPO)
event
In
the
event
of
a
room
emergency
power-off
(EPO)
shutdown,
the
SAN
Volume
Controller
completes
the
process
of
shutting
down
the
output
from
the
uninterruptible
power
supplies
within
5
minutes.
Attention:
If
an
EPO
event
occurs
and
the
uninterruptible
power
supply
is
not
connected
to
at
least
one
operational
SAN
Volume
Controller
the
output
cables
of
the
uninterruptible
power
supply
must
be
unplugged
to
remove
output
power
from
the
uninterruptible
power
supply.
Checking
the
safety
labels
on
the
SAN
Volume
Controller
The
following
topics
describe
how
to
check
the
labels
on
the
SAN
Volume
Controller.
Steps:
Perform
the
following
label
checks:
1.
Agency/ratings
label.
See
About
this
guide
xv
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...