Attention:
To
tighten
wing
nuts
2
and
3
you
will
require
access
from
above
the
rails.
Ensure
that
the
support
rails
are
installed
before
anything
is
installed
in
the
8
EIA
units
above
the
rails.
If
any
pre-existing
devices
have
been
installed
in
that
space
it
might
be
necessary
to
remove
those
devices
before
installing
the
rails.
4.
Perform
the
following
steps
for
each
rail:
a.
Attach
nut
clips
4
to
the
rack.
These
nut
clips
must
align
with
the
second
and
fourth
holes
of
the
support
rail
flange.
b.
Loosen
the
two
wing
nuts
2
.
c.
Loosen
the
wing
nut
3
and
slide
the
bracket
toward
the
back
of
the
rail.
d.
Remain
at
the
back
of
the
rack,
hold
the
support
rail
in
position
in
the
rack,
then
install
and
fully
tighten
the
two
mounting
screws
5
.
e.
Go
to
the
front
of
the
rack.
f.
Extend
the
support
rail
toward
the
front
of
the
rack.
Note:
Hold
the
support
rail
in
position
until
you
have
completed
step
g.
Ensure
that
the
support
rail
is
horizontal
(a
level
might
be
useful
here).
h.
Install
the
two
mounting
screws
1
into
the
third
and
fourth
holes
of
the
support
rail
flange.
Fully
tighten
the
screws.
i.
Fully
tighten
the
two
wing
nuts
2
.
j.
Loosen
the
wing
nut
3
and
slide
the
bracket
toward
the
front
of
the
rail,
as
far
as
it
will
go,
with
the
front
edge
of
the
bracket
against
the
back
end
of
the
front
support
rail.
Fully
tighten
the
wing
nut
3
Installing
the
uninterruptible
power
supply
into
the
rack
After
you
have
completed
the
preparation
procedures
for
installing
the
uninterruptible
power
supply
into
the
rack,
you
are
ready
to
install
the
uninterruptible
power
supply
into
the
rack.
Prerequisites:
Ensure
that
you
have
completed
the
following:
v
The
pre-installation
procedures
v
Installing
the
support
rails
for
the
uninterruptible
power
supply
v
Preparing
your
uninterruptible
power
supply
environment
Attention:
Before
you
begin
to
install
the
uninterruptible
power
supply,
read
through
the
safety
and
environmental
notices.
Steps:
Perform
the
following
steps
to
install
the
uninterruptible
power
supply
into
the
rack:
1.
CAUTION:
The
uninterruptible
power
supply
weighs
39
kg
(86
lb)
with
the
electronics
assembly
and
the
battery
assembly
installed:
v
Do
not
attempt
to
lift
the
uninterruptible
power
supply
by
yourself.
Ask
another
service
representative
for
assistance.
18
Installation
Guide
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...